Skip to content
HyperLink

Solutions

Your Scenario. Our Expertise.

Every connectivity requirement has unique constraints. Find the solution that matches your deployment and move directly to feasibility.

  • Routes designed around your requirements—not ours
  • Feasibility response within 48 hours
  • Single team from design through operations

Vertically Integrated

Design through operations

Diversity Engineering

Verified physical separation

Schedule Certainty

Direct-employ delivery model

Acceptance-Ready

Full test documentation

Rapid Response

Days to feasibility

Find Your Scenario

Solutions by Use Case

Select the scenario that matches your connectivity requirement.

AI Cluster / GPU Campus

GPU-dense facilities demand fiber infrastructure that matches their intensity. High fiber counts, ultra-low latency paths, and the reliability that training workloads require. We understand east-west traffic patterns and rapid scaling needs.

What It Solves

  • Massive interconnect bandwidth between GPU racks
  • Sub-millisecond latency requirements for distributed training
  • Rapid capacity scaling as clusters expand
  • Redundancy for training job continuity

What HyperLink Delivers

  • High-count fiber (288-864+) optimized for AI traffic
  • Latency-engineered routing with verified measurements
  • Phased delivery aligned with cluster deployment
  • Diverse paths with verified physical separation
  • 24/7 monitoring and rapid response SLAs
AI Campus Deployment showing three availability zones (AZ1, AZ2, AZ3) connected in a mesh topology with a cloud Region connection

When to Use It

  • Building or expanding a GPU training cluster
  • Connecting multiple AI facilities within a campus
  • Requiring dedicated low-latency paths to cloud or IX
  • Needing redundancy for long-running training jobs

Inputs to Start Feasibility

  • Facility locations (addresses or coordinates)
  • Fiber count requirements
  • Latency targets
  • Diversity requirements
  • Target RFS date
  • Scaling projections

Hyperscaler Campus & Region

Cloud region buildouts require multi-route diversity and massive capacity delivered on aggressive timelines. We've built for the biggest names in cloud—and we understand the stakes.

What It Solves

  • Multi-building campus interconnect complexity
  • Availability zone physical separation requirements
  • Phased delivery coordination with construction
  • Long-term capacity planning across region lifecycle

What HyperLink Delivers

  • Campus ring architectures with verified diversity
  • Multiple diverse entry points per building
  • Delivery schedules aligned with your construction phases
  • Capacity roadmaps supporting 10+ year horizons
  • Single point of accountability across all routes
Hyperscaler Campus and Region Connectivity showing multiple data center campuses connected via existing and planned fiber infrastructure

When to Use It

  • Planning a new cloud region or availability zone
  • Expanding an existing hyperscaler campus
  • Requiring verified diverse paths for SLA compliance
  • Coordinating fiber delivery with building construction

Inputs to Start Feasibility

  • Campus site plan or building locations
  • Fiber count per building
  • Diversity requirements (entry points, conduit, splice)
  • Construction schedule milestones
  • Long-term capacity projections

New Data Center Development

Greenfield data center projects need connectivity partners who can move at development speed. We integrate with your construction timeline and deliver acceptance-ready fiber on schedule.

What It Solves

  • Coordination between site development and fiber delivery
  • Permit and ROW acquisition in new markets
  • Initial connectivity to existing network infrastructure
  • Future-proofing for multi-phase buildouts

What HyperLink Delivers

  • Early engagement during site selection phase
  • Permit and ROW acquisition handled in-house
  • Fiber delivery coordinated with your construction milestones
  • Scalable infrastructure supporting future phases
  • Diverse path options from day one
HyperLink's deep existing infrastructure knowledge showing existing data center connected to planned data center via IX/POP with diverse fiber and known infrastructure routes

When to Use It

  • Developing a new data center site
  • Evaluating connectivity options during site selection
  • Needing fiber delivery aligned with construction schedule
  • Planning multi-phase campus buildout

Inputs to Start Feasibility

  • Site location and development timeline
  • Initial and future fiber count requirements
  • Target network POPs or meet-me points
  • Diversity requirements
  • Construction milestone schedule

Metro Laterals

Fast-turn connections linking your facility to carrier hotels, IXPs, and network POPs. Urban construction expertise that navigates permitting complexity and delivers on aggressive timelines.

What It Solves

  • Last-mile connectivity gaps in metro areas
  • Complex urban permitting and construction
  • Time-sensitive facility turn-ups
  • Carrier hotel and IX access requirements

What HyperLink Delivers

  • Rapid deployment (8-16 weeks typical)
  • Urban construction expertise in major metros
  • Established relationships at key carrier hotels
  • Scalable fiber counts (12 to 288+)
  • Permit management and ROW acquisition
Metro lateral connectivity showing diverse fiber infrastructure connecting existing POP to new POP in urban area

When to Use It

  • Opening a new facility in a metro market
  • Needing fast connectivity to a carrier hotel or IX
  • Requiring a dedicated path (not shared infrastructure)
  • Connecting to cloud on-ramps or meet-me points

Inputs to Start Feasibility

  • A-Z addresses
  • Fiber count requirements
  • Target RFS date
  • Specific meet-me room or carrier hotel
  • Any known site access constraints

Regional Corridors

Long-haul routes connecting major markets with the capacity and redundancy that backbone networks demand. Purpose-built paths on optimal routes—not IRU fragments stitched together.

What It Solves

  • Inter-market connectivity on optimal paths
  • High-capacity backbone requirements
  • Strategic mid-route access points
  • Alternative paths to incumbent carriers

What HyperLink Delivers

  • New-build routes engineered for your requirements
  • High fiber counts for wholesale and carrier use cases
  • Multiple path options for redundancy planning
  • Mid-route access points at strategic locations
  • Route control and documentation you can trust
Major build between major metro markets showing diverse fiber infrastructure and known infrastructure routes across the United States

When to Use It

  • Building or expanding a regional backbone network
  • Needing an alternative to incumbent carrier routes
  • Requiring high-count fiber for wholesale operations
  • Planning strategic mid-route access points

Inputs to Start Feasibility

  • A-Z markets
  • Fiber count requirements
  • Required or preferred mid-route access points
  • Timeline and phasing requirements
  • Redundancy/diversity strategy

Diversity & Resiliency

When uptime is non-negotiable, verified physical diversity isn't optional. We design, build, and document diverse paths that actually protect you—not just on paper.

What It Solves

  • Single points of failure in existing infrastructure
  • Unverified or paper diversity from other providers
  • SLA requirements mandating physical separation
  • Regulatory compliance for critical infrastructure

What HyperLink Delivers

  • Verified physical separation at every level
  • Diverse entry points, conduit paths, and splice locations
  • Detailed diversity documentation and as-builts
  • Ongoing monitoring for diversity maintenance
  • Engineering review of existing infrastructure diversity
True physical diversity between two locations showing diverse fiber path and known infrastructure routes avoiding natural disaster zones

When to Use It

  • Requiring verified diverse paths for critical workloads
  • Auditing existing infrastructure for single points of failure
  • Meeting SLA or regulatory diversity requirements
  • Adding redundancy to an existing network

Inputs to Start Feasibility

  • Existing infrastructure details (if adding diversity)
  • Diversity requirements (entry, conduit, splice)
  • Locations requiring protection
  • SLA or compliance requirements
  • Target RFS date

Rapid Expansion

When the timeline is aggressive and the stakes are high, you need a builder who can execute. Our direct-employ model and vertical integration eliminate the delays that slow everyone else down.

What It Solves

  • Aggressive deployment timelines
  • Contractor coordination bottlenecks
  • Permit delays and ROW complications
  • Schedule uncertainty and milestone slippage

What HyperLink Delivers

  • Accelerated feasibility response (48 hours)
  • Direct-employ crews ready to mobilize
  • Parallel-path permitting and ROW acquisition
  • Daily progress visibility and milestone tracking
  • Schedule certainty backed by vertical integration
Compressed and accelerated timeline showing phases: Preliminary Planning, Permitting, Construction, and Test/Turn-up with accelerated vs standard timeline comparison

When to Use It

  • Facing an aggressive go-live deadline
  • Needing connectivity for a time-sensitive deployment
  • Experiencing delays with current provider
  • Requiring schedule certainty for business-critical projects

Inputs to Start Feasibility

  • A-Z locations
  • Target RFS date (hard deadline)
  • Fiber count requirements
  • Any known constraints or blockers
  • Decision timeline

How We Work

From Request to Ready-for-Service

A straightforward engagement process designed for speed and clarity.

01

Submit Requirements

Share your connectivity needs, locations, and timeline. We respond within 48 hours.

02

Feasibility Review

Our engineering team assesses routes, permits, and construction approach.

03

Proposal & Build

Receive detailed proposal with schedule certainty. Approve and we break ground.

What to Include in Your Request

  • A-Z locations (addresses or coordinates)
  • Fiber count requirements
  • Target RFS date
  • Diversity requirements (if applicable)
  • Any known site constraints
  • Contact for technical discussion
Start Feasibility Request

Proof of Execution

Selected Work

Anonymized examples of how we've solved real connectivity challenges.

METRO

Metro Lateral for AI Campus

Challenge

Hyperscaler needed 288-count fiber to new AI training facility in 90 days.

Approach

Parallel permitting, pre-staged materials, dual construction crews.

Result

Delivered in 78 days with full diversity from existing network.

CORRIDOR

High-Density Corridor Expansion

Challenge

Carrier required additional 432 fibers along congested urban route.

Approach

Micro-trenching in existing ROW, night construction, zero service impact.

Result

Completed without disrupting live traffic on adjacent fibers.

BACKBONE

Regional Backbone Build

Challenge

Data center operator needed diverse path between two major metros.

Approach

110-mile greenfield build with railroad and DOT crossings.

Result

True physical diversity, independent of all existing carriers.

EMERGENCY

Emergency Restoration

Challenge

Fiber cut impacting critical enterprise customer during business hours.

Approach

Pre-positioned splice trailer, on-site in 45 minutes, priority restoration.

Result

Service restored in under 3 hours, full root cause analysis provided.

BUILD-TO-SUIT

Build-to-Suit for Hyperscaler

Challenge

Custom route required connecting three campus locations with strict latency requirements.

Approach

Low-latency route design, aerial construction where possible, dedicated fiber allocation.

Result

Sub-millisecond latency achieved across all three sites.

DIVERSITY

Diversity Engineering Project

Challenge

Enterprise customer discovered existing diverse routes shared conduit at two points.

Approach

Route audit, new truly diverse path identification, incremental construction.

Result

Eliminated shared points of failure, documented physical separation.

FAQs

Common Questions

Ready to discuss your requirements?

Tell us about your connectivity scenario. We'll respond with feasibility within 48 hours.

Request Feasibility